Saturday, June 23, 2012

Project 3 - first step


this is first two concept roof shape of my idea. thus the site is surrounded by heaps of buildings which are most over 10meters and the site tile to west on truth north.




what  I have learned from

project 3 - poster requirements

1: at least in A1 size poster
2:your concept and your theme organized in graphic ways, don't have too much text, explain in drawings
3: describe the site, come with graphs or pictures, the relationship with neighbors
4: long section drawings showing details of the street , be careful with the line weight
5: a special view of your model, like a rendering picture, point out your theme
6: talk about what made out the building , could be about materials

Project 3 - understand and highlight of the outline

three theme:
1: through changing the transparency degree of glass to provide public and private space for building
2: creat different level height to seperte space instead of using solid wall.
3: soft curve using in the building will soften people's visual view.

project3 - first concept model



project 3 final poster



Wednesday, April 25, 2012

PROJECT 2 - FINAL SUBMISSION CONCEPT

ARCHITECTURAL PROPORTIONS 
 what I have learn from Aalto's design is that all the how to combine the abstract idea together and won't make it hard to understand. The more you dig out from villa mairea, the more you will be amazed. Like the building shape and half open half closed spaces. First, don't make your building too abrupt to the surrounding environment, like the columns using in the Villa and the details about columns make a echo to the forest, also has good effect to different perspective views. From Villa Mairea, the second good point is division of public and private space, Aalto's practice didn't make the building sort of only building and has no harmony feelings to people, the villa is not only the place people have daily activities, but also the place people will love it because of it fulls of vigor and nature.

Tuesday, April 24, 2012

PROJECT 2 -FINAL SUBMISSION



WEEKLY PROCESS- project 2

instead of using physical wall to divide the space into different function room, Aalto used different material

detail draft drawing of my colunm analyse


circulation of my work

WEEKLY PROCESS - project 2

VILLA MAIREA
I chose villa mairea is because this building is kind of different from my project 1 building, villa muller is arranged in one big box and the box divided in different story level, villa mairea is much different, it is built in “U” shape and surrounding by the trees, the reason why I chose villa mairea is that I want to figure out why Aalto has such idea to build in irregular shape and the interior space has so many startling design, and in architect aspect, even very detail point, there is also some surprise for you to dig out.


site of the villa, it's surrounding by forest and has great connection of their families who live in different place.

Monday, March 26, 2012

Project 2 - VILLA MAIREA - three strategic aspects of the architecture-


• nap the relationship of public to more private spaces in the house and the way in which these zones are distiguished or architecturally articulated.
• Spatialy and dimensionally study the circulation of the house and the way in which it can suggest an implied narrative or plot connecting a series of uses.
• Examine the architectural attitude towards material in the house; the material choices employed and
the relationships between different materials. Search for connections between this attitude and the
architectural patterns of domestic occupation.

Monday, March 12, 2012